Manager’s Dashboard (Project) – Risk Register

The Manager’s Dashboard page shows up to 6 graphs which are chosen by the user.  The graphs shown on this page must be created on the Standard Reports (Project) page.  The Manager’s Dashboard gives you the ability to quickly view critical project information and export them to MS Word and MS Power Point.

 

Figure 1

 

Show Dashboard:

This functionality is used to show the corresponding dashboard selected.  In Figure 1, there is a select box which contains dashboard names.  Each dashboard name generates the dashboard associated with it.

Steps:

  1. Risk Register —>Dashboards —>Manager´s Dashboard
  2. Select the name of the dashboard from the Project Dashboard dropdown.  (Figure  1)
  3. Click the Show button to navigate to view the dashboard.  (Figure 1)

To navigate to Project Dashboard:

Steps:

  1. Risk Register —>Dashboards —>Manager´s Dashboard
  2. Select the Project Dashboard from the Project Dashboard dropdown.  (Figure  1)
  3. Click the Show button to navigate to Project Dashboard page.  (Figure 1)

 

Delete Dashboard:

This functionality is used to delete the corresponding dashboard selected.

Steps:

  1. Risk Register —>Dashboards —>Manager´s Dashboard
  2. Select the Dashboard Name from the Project Dashboard dropdown.  (Figure  1)
  3. Click the Delete button to delete the selected Dashboard.  (Figure 1)

 

Export to Word:

This functionality is used to export the selected chart to MS Word.

Steps:

  1. Risk Register —>Dashboards —>Manager´s Dashboard
  2. Select the chart using the provided checkbox in the corner of each chart.  (Figure 1)
  3. Click the Open in Word icon to export the chart to MS Word.  (Figure 1)

 

Export to Power Point:

This functionality is used to export the selected chart to MS Power Point.

Steps:

  1. Risk Register —>Dashboards —>Manager´s Dashboard
  2. Select the chart using the provided checkbox in the corner of each chart.  (Figure 1)
  3. Click the Power Point icon to export the chart to MS Power Point.  (Figure 1)

 

Compress Files:

This functionality is used to compress the selected images to a Zip file.

Steps:

  1. Risk Register —>Dashboards —>Manager´s Dashboard
  2. Select the chart using the provided checkbox in the corner of each chart.  (Figure 1)
  3. Click the Compress Files icon.  (Figure 1)

 

Check All:

This functionality is used to select all the charts.  Click the Check All icon to select all the charts.  (Figure 1)

 

Uncheck All:

This functionality is used to uncheck the selected charts.  Click the Uncheck All icon to uncheck the charts selected.

 

Set as default:

This functionality is used to make the selected dashboard as the default dashboard.  Click the Set as Default icon to set a dashboard as default.  (Figure 1)

 

Refresh:

This functionality is used to refresh the chart with the most recent data from the project database.  To refresh the chart, click the Refresh icon.  (Figure 1)

 

Reposition Arrows:

This functionality allows the user to move the selected chart to another position on the page.  To reposition a selected chart, click the Reposition arrows nearby.  (Figure 1)

 

Filter:

To view the filter applied to the chart, click the Show Filter icon.  (Figure 1)  An example of the screen that appears after filter is clicked is shown in Figure 2.

 

Figure 2

 

If the user changes the business unit on Manage Projects page for the projects in a particular chart which is already added on dashboard in which filter is applied, then on clicking the Refresh button those filters will be removed from the chart.

 

Delete From Dashboard:

This functionality allows you to delete a chart from the Manager’s Dashboard (Portfolio).  To delete a chart, click the Delete icon above each chart.  (Figure 1)

 

Drill Down:

This functionality allows you to redirect to the particular report page in Standard reports (Portfolio) from where the chart is added.  To redirect a chart, click the Drill Down icon.  (Figure 1)

 

Copy to Dashboard:

This functionality allows you to copy a particular chart to another dashboard.  Click the Copy to Dashboard icon.

Steps:

  1. Risk Register>Dashboards —>Manager´s Dashboard.
  2. Click the Copy to Dashboard icon.  (Figure 1)
  3. A pop up appears.  (Figure 3)  Select the name of the dashboard from the Name dropdown, to which the chart has to be copied.
  4. Click Save button.  (Figure 3)

 

RR_dashboard_copy_to_dashboard

Figure 3

 

Share Dashboard:

This functionality allows you to share one dashboard charts to a new dashboard.  Click Share Dashboard icon.

Steps:

  1. Risk Register>Dashboards —>Manager´s Dashboard.
  2. Click the Share Dashboard icon.  (Figure 1)
  3. A pop up appears.  (Figure 4)  Give the name and description of the new dashboard to which the chart has to be shared.  The global access option allows the user to share the dashboard globally.
  4. Click Save button.  (Figure 4)

 

RR_dashboard_share_dashboard

Figure 4



Copyright © 2021 PRC Software. All rights reserved

This will close in 0 seconds


This will close in 0 seconds

The PRC Enterprise Risk Register is a web-based risk management software solution which allows for the tracking of risk at the project and portfolio level.  Audit logs for all risk updates and changes are available at the click of a button to aid with audits, claims and the flow of information.  The power of the PRC Enterprise Risk Register is in the simplicity of the user interface, which is designed to navigate easily at both project and portfolio levels without compromising functionality or data.  The PRC Enterprise Risk Register allows for mapping across project levels so the data can be reported at the portfolio level, even if the work, risk and organizational breakdown structures are not standardized.

Read More

This will close in 0 seconds

The PRC Enterprise Cost Risk Analysis is a customizable web-based solution for simulating estimate cost and determining cost contingency, cost drivers, and risk hotspots. The key to a good risk analysis is good inputs.  The software cannot be a roadblock to success. Good risk software should be easy on the end user. Monte Carlo simulation is already a complex.  The software should simplify the process.

Read More

This will close in 0 seconds

The PRC Enterprise Schedule Risk Analysis is a customizable web-based solution for simulating schedule duration and dates. At PRC Software, we believe that the key to good risk software is through good inputs and excellent user friendliness. A Monte Carlo simulation is already a complex.  The software should not be complicated as well.

Read More

This will close in 0 seconds

PRC specializes in risk analysis, audit, and training.  We have cross-industry experience in fields such as Aerospace & Defense, Oil & Gas, and Engineering & Construction.  We believe that over-complicating the risk process often leads to wasted effort and poor results.  Our goal is to "make it simple."

Read More

This will close in 0 seconds