Figure 1
Steps:
EPS nodes can be imported only by Super Users and only if the project has not been assigned to any available nodes. The imported file must be of type csv, xls, mpp or xer. Before a file is imported, all nodes except the root node must be deleted in order to accommodate the new nodes.
Steps:
Sample sheet used for import:
WBS code | Description | Outline Level |
A | ABC123 |
1 |
B | ABC124 |
2 |
C | ABC125 |
2 |
Figure 2
This functionality is used to get a sample XLS file for importing to the breakdown structures.
Steps:
Sample Excel Template:
Figure 3
This functionality is used to add a new EPS node.
Steps:
Figure 4
This functionality removes an existing EPS node.
Steps:
Copyright © 2021 PRC Software. All rights reserved
This will close in 0 seconds
This will close in 0 seconds
The PRC Enterprise Risk Register is a web-based risk management software solution which allows for the tracking of risk at the project and portfolio level. Audit logs for all risk updates and changes are available at the click of a button to aid with audits, claims and the flow of information. The power of the PRC Enterprise Risk Register is in the simplicity of the user interface, which is designed to navigate easily at both project and portfolio levels without compromising functionality or data. The PRC Enterprise Risk Register allows for mapping across project levels so the data can be reported at the portfolio level, even if the work, risk and organizational breakdown structures are not standardized.
This will close in 0 seconds
The PRC Enterprise Cost Risk Analysis is a customizable web-based solution for simulating estimate cost and determining cost contingency, cost drivers, and risk hotspots. The key to a good risk analysis is good inputs. The software cannot be a roadblock to success. Good risk software should be easy on the end user. Monte Carlo simulation is already a complex. The software should simplify the process.
This will close in 0 seconds
The PRC Enterprise Schedule Risk Analysis is a customizable web-based solution for simulating schedule duration and dates. At PRC Software, we believe that the key to good risk software is through good inputs and excellent user friendliness. A Monte Carlo simulation is already a complex. The software should not be complicated as well.
This will close in 0 seconds
PRC specializes in risk analysis, audit, and training. We have cross-industry experience in fields such as Aerospace & Defense, Oil & Gas, and Engineering & Construction. We believe that over-complicating the risk process often leads to wasted effort and poor results. Our goal is to "make it simple."
This will close in 0 seconds