Home Product: Primavera Risk (Pertmaster)
Follow Us:
Product Training: Primavera Risk (Pertmaster)
work_breakdown_128.png

The Oracle | Primavera Risk (Pertmaster) on-line video training modules are designed to aid users in becoming proficient with the Oracle risk analysis solution to effectively conduct a schedule or cost Monte Carlo analysis.  The class is a good introduction for beginners and a valuable refresher course for those who have been previously trained to use Primavera Risk (Pertmaster). 

 

Risk analysis is a very difficult topic that includes risk theory, statistics, scheduling, and psychology.  There is no substitute for interactive training sessions and experience, however the modules go beyond button to help users get more value from quantitative risk analysis.  The Oracle | Primavera Risk: Pertmaster tool is very powerful.  A powerful tool often leads to a challenging learning curve.  

 

Our goal is to make the interfaces, button clicks, and concepts readily available to users so those who may not use the tool every day can still get great value from it.  We break Monte Carlo risk analyis into repeatable, traceable 7 step process to help users get through an analysis whether it is on a 1 million or 5 billion dollar project.  We are always available via phone to answer quick questions that you may not be able to get answered via typical tech support..  For technical questions or to schedule a live training session please call us at 1-877-476-7475 or e-mail This e-mail address is being protected from spambots. You need JavaScript enabled to view it .

 

  • Primavera Risk: Pertmaster Tool Overview   ( 11 Articles )

     This section will provide an overview of the Oracle | Primavera Risk: Pertmaster interface and main menus.

     

  • Primavera Risk: Important Options & Functionality   ( 7 Articles )

     This section will provide an overview of important options and critical functionality in the Oracle | Primavera Risk: Pertmaster product.


  • Primavera Risk: Step 1 - Pertmaster Import   ( 3 Articles )

    The first step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is importing the project from the scheduling tool such as Primavera P6, Microsoft Project, or Deltek's OpenPlan.

     

  • Primavera Risk: Step 2 - Pertmaster Import Check   ( 4 Articles )

    The second step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is validating that the data imported matches the data in the main schedule tool, such as Primavera P6 or Microsoft Project.

     

  • Primavera Risk: Step 3 - Pertmaster Schedule Check   ( 3 Articles )

    The third step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is improving the schedule maturity via schedule checks and test Monte Carlo analysis iterations to validate the schedule logic.

     

  • Primavera Risk: Step 4 - Pertmaster Uncertainty   ( 5 Articles )

    The fourth step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is loading three-point estimates based on uncertainty or productivity directly onto the schedule activities.

     

  • Primavera Risk: Step 5 - Pertmaster Risk Register   ( 6 Articles )

    The fifth step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is loading and integrating risk events into the risk register for an additional layer of accuracy and traceability in a Monte Carlo analysis.

     

  • Primavera Risk: Step 6 - Pertmaster Run Analysis   ( 2 Articles )

    The sixth step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is running the Monte Carlo simulations (iterations).  This section will review the various analysis options.

     

  • Primavera Risk: Step 7 - Pertmaster Reports   ( 3 Articles )

    The seventh step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is creating quantitative risk analyis charts, such a histograms, scatter plots, tornado charts, cost benefit curves, and probabilistic cash & resource flow carts.

     

  1. PRC Risk Register: Add or Delete a Project (2011-07-12 15:38:36)
  2. PRC Risk Register: View & Edit Project Access (2011-07-12 15:38:49)
  3. PRC Risk Register: Assign Users to Projects (2011-07-12 15:38:58)
  4. PRC Risk Register: User Privileges (2011-07-12 15:36:37)
  5. PRC Risk Register: Add and Delete Users (2011-07-12 15:36:04)
PRC Risk RegisterPRC Risk WorkshopsPRC Consulting ServicesPrimavera Risk (Pertmaster) TrainingPRC Monte Carlo Analysis