Pertmaster

The Oracle | Primavera Risk (Pertmaster) on-line video training modules are designed to aid users in becoming proficient with the Oracle risk analysis solution to effectively conduct a schedule or cost Monte Carlo analysis.  The class is a good introduction for beginners and a valuable refresher course for those who have been previously trained to use Primavera Risk (Pertmaster)

  • Oracle | Primavera Risk: Pertmaster User Interface ( 1 Articles )

    The fourth step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is loading three-point estimates based on uncertainty or productivity directly onto the schedule activities.

  • Primavera Risk: Important Options & Functionality ( 7 Articles )

    This section will provide an overview of important options and critical functionality in the Oracle | Primavera Risk: Pertmaster product.

  • Primavera Risk: Pertmaster Tool Overview ( 11 Articles )

    This section will provide an overview of the Oracle | Primavera Risk: Pertmaster interface and main menus.

  • Primavera Risk: Step 1 – Pertmaster Import ( 3 Articles )

    The first step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is importing the project from the scheduling tool such as Primavera P6, Microsoft Project, or Deltek's OpenPlan.

  • Primavera Risk: Step 2 – Pertmaster Import Check ( 4 Articles )

    The second step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is validating that the data imported matches the data in the main schedule tool, such as Primavera P6 or Microsoft Project.

  • Primavera Risk: Step 3 – Pertmaster Schedule Check ( 3 Articles )

    The third step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is improving the schedule maturity via schedule checks and test Monte Carlo analysis iterations to validate the schedule logic.

  • Primavera Risk: Step 4 – Pertmaster Uncertainty ( 5 Articles )

    The fourth step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is loading three-point estimates based on uncertainty or productivity directly onto the schedule activities.

  • Primavera Risk: Step 5 – Pertmaster Risk Register ( 6 Articles )

    The fifth step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is loading and integrating risk events into the risk register for an additional layer of accuracy and traceability in a Monte Carlo analysis.

  • Primavera Risk: Step 6 – Pertmaster Run Analysis ( 2 Articles )

    The sixth step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is running the Monte Carlo simulations (iterations). This section will review the various analysis options.

  • Primavera Risk: Step 7 – Pertmaster Reports ( 3 Articles )

    The seventh step of any Oracle | Primavera Risk: Pertmaster schedule risk analyis is creating quantitative risk analyis charts, such a histograms, scatter plots, tornado charts, cost benefit curves, and probabilistic cash & resource flow carts.